Atlin group fights Yukon Energy dam plans

ATLIN LAKE, BRITISH COLUMBIA - People in the northwestern British Columbia community of Atlin are opposing Yukon Energy Corp.'s proposal to build a dam that residents say would affect a local lake.

Engineers with the Yukon's public utility are in their first year of field studies on the Atlin River, trying to determine if a weir or dam on the river could hold back the fall runoff from Atlin Lake.

Yukon Energy wants to control the fall drainage so more water is retained for the winter, when the utility would need it for hydroelectric production.

But some residents in the remote community of about 400 say Yukon Energy's field studies are a waste of money, since they would never allow the corporation to build a control structure on their waterways.

"Atlin Lake is the largest natural body of water in B.C. and it is, at this stage, pristine and untouched," Penny Wallis, who lives on the Atlin waterfront, told CBC News.

"If we let anyone begin to do things to this lake, then it could be the end of it. I am totally against this project."

Atlin is located in the far northwestern corner of B.C., about 180 kilometres southeast of Whitehorse.

While Yukon Energy has opened a temporary part-time office in Atlin to keep the community posted about its field work, some residents are forming the Protect Atlin Lake Society to oppose the whole project.

"I hope we can cut it off at the knees, frankly," said Wayne Merry, a longtime Atlin resident and a member of the society.

Yukon Energy says it needs at least one more year of field work on the Atlin River. Merry said the millions of dollars the utility has budgeted for the studies could be better spent elsewhere.

"I know they're investing," he said. "We've talked to them about that and said, 'Look, why waste this money?' Because this is not going to happen."

The society has written to B.C. Environment Minister Barry Penner, raising numerous environmental concerns they have with the Yukon Energy project. The group wants the Atlin River to be designated as a special protected area, adjacent to Atlin Provincial Park.

Related News

vancouver skyline at night

Electricity use actually increased during 2018 Earth Hour, BC Hydro

VANCOUVER - For the first time since it began tracking electricity use in the province during Earth Hour, BC Hydro said customers used more power during the 60-minute period when lights are expected to dim.

The World Wildlife Fund launched Earth Hour in Sydney, Australia in 2007. Residents and businesses there turned off lights and non-essential power as a symbol to mark the importance of combating climate change.

The event was adopted in B.C. the next year and, as part of that, BC Hydro began tracking the megawatt hours saved.

#google#

In 2008, residents and businesses achieved a two per cent savings in electricity use. But since…

READ MORE
nuclear power

IEA: Asia set to use half of world's electricity by 2025

READ MORE

solar power panels

Electricity distributors warn excess solar power in network could cause blackouts, damage infrastructure

READ MORE

ontario nuclear

Ontario confronts reality of being short of electricity in the coming years

READ MORE

energy-vault-secures-28m-for-california-green-hydrogen-microgrid

Energy Vault Secures $28M for California Green Hydrogen Microgrid

READ MORE