NDRC approves four large renewable energy projects

subscribe

China's National Development and Reform Commission (NDRC) has approved four large renewable energy projects — two wind and two hydro, the NDRC announced.

One of the projects is the Jiangsu Rudong Wind Power Phase II expansion, which will be built and operated by Jiangsu Longyuan Wind Power Company Limited, a subsidiary of China Guodian Corporation. The project will have a total installed capacity of 100.5 megawatts (MW) and 67 wind turbines.

China Huadian Corporation received approval for the Guyuan Windfarm project in Hebei province. This project will also have a total installed capacity of 100.5 MW and 67 wind turbines.

Beipan River Power Company Limited, a holding subsidiary of Guizhou Qianyuan Power Company Limited, will built and operate the 880-MW Dongqing Hydropower project, which will be located on the mainstream of the Beipan River in Guizhou. The project will have four 220-MW Francis turbine-generating units with a designed annual power output of 3.04 billion kilowatt-hours. This project is estimated to cost about $941 million.

The fourth project is the 920-MW Luding Hydropower project, located on the mainstream of the Dadu River in Sichuan province. The project will be built and operated by Sichuan Huadian Luding Hydropower Company Limited, a holding subsidiary of China Huadian. This project will have four 230-MW Francis turbine-generating units.

Related News

niagara falls adam beck station

Niagara Falls Powerhouse Gets a Billion-Dollar Upgrade for the 21st Century

TORONTO - Ontario's iconic Sir Adam Beck hydroelectric generating station in Niagara is set to undergo a massive, billion-dollar refurbishment. The project will significantly boost the power station's capacity and extend its lifespan, ensuring a reliable supply of clean energy for decades to come.


A Century of Power Generation

The Sir Adam Beck generating stations have played a pivotal role in Ontario's power grid for over a century. The first generating station, Sir Adam Beck I, went online in 1922, followed by Sir Adam Beck II in 1954. A third station, the Sir Adam Beck Pump Generating Station,…

READ MORE

For Hydro-Québec, selling to the United States means reinventing itself

READ MORE

nuclear power

IEA: Asia set to use half of world's electricity by 2025

READ MORE

coal plant

18% of electricity generated in Canada in 2019 came from fossil fuels

READ MORE

How Electricity Gets Priced in Europe and How That May Change

READ MORE