Electrical Commissioning In Industrial Power Systems
Our customized live online or in‑person group training can be delivered to your staff at your location.
- Live Online
- 12 hours Instructor-led
- Group Training Available
Ten firefighting crews attended a blaze that broke out in the boiler annex around midnight, putting out the fire by 2 a.m. Firefighters remained on-site until the following day, before returning control of the site to British Energy.
The fire meant taking one of the two reactors at the site offline. The other reactor is already offline for scheduled maintenance. All 57 staff were evacuated after the alarm was sounded.
'There was no risk to the public, and there was no release of radioactive material,' said a spokesperson for British Energy. "[Investigators] are looking at the cause of the fire and will be bringing the reactor back online as soon as possible."
When operational, the 1,090-megawatt plant is capable of generating enough electricity to power 1.5 million homes. In June, British Energy admitted that there had been a Level 2 alert at Dungeness B, but claimed that it was not related to the reactors.
Related News
Edmonton's 1st electric bus hits city streets
Biden calls for 100 percent clean electricity by 2035. Here’s how far we have to go.
Hundreds facing hydro disconnection as bills pile up during winter ban
Congressional Democrats push FERC to act on aggregated DERs
Hydro One CEO's $4.5M salary won't be reduced to help cut electricity costs
UK's Energy Transition Stalled by Supply Delays
Sign Up for Electricity Forum’s Newsletter
Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.
Electricity Today T&D Magazine Subscribe for FREE
- Timely insights from industry experts
- Practical solutions T&D engineers
- Free access to every issue