Protective Relay Training - Basic
Our customized live online or in‑person group training can be delivered to your staff at your location.
- Live Online
- 12 hours Instructor-led
- Group Training Available
The study is expected to be completed in November, with results forming the basis for the final sales confirmation, system designs, project structure and delivery schedule. The work is spearheaded by the VRB Project Management and Engineering team with deliverables including drawings, reports, structural layouts and controls descriptions. The fee received for performing the study was $95,000.
"The study will help us identify the appropriate size VRB-ESS for Kotzebue's wind/diesel hybrid generation system, that currently uses 17 wind turbines to augment its existing 11.5MW of diesel generators," says Brian Beck, VP of Business Development at VRB Power Systems. "The VRB will be used to improve system stability and efficiency of generators; as well as allow for the deployment of additional wind turbines and reduce fuel usage and related green house gas emissions."
Related News
Biggest in Canada: Bruce Power doubles PPE donation
Atlantic Canadians less charged up to buy electric vehicle than rest of Canada
City officials take clean energy message to Georgia Power, PSC
Integrating AI Data Centers into Canada's Electricity Grids
$1 billion per year is being spent to support climate change denial
External investigators looking into alleged assaults by Manitoba Hydro workers
Sign Up for Electricity Forum’s Newsletter
Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.
Electricity Today T&D Magazine Subscribe for FREE
- Timely insights from industry experts
- Practical solutions T&D engineers
- Free access to every issue