NFPA 70E Training - 2027 Edition
Our customized live online or in‑person group training can be delivered to your staff at your location.
- Live Online
- 6 hours Instructor-led
- Group Training Available
The study is expected to be completed in November, with results forming the basis for the final sales confirmation, system designs, project structure and delivery schedule. The work is spearheaded by the VRB Project Management and Engineering team with deliverables including drawings, reports, structural layouts and controls descriptions. The fee received for performing the study was $95,000.
"The study will help us identify the appropriate size VRB-ESS for Kotzebue's wind/diesel hybrid generation system, that currently uses 17 wind turbines to augment its existing 11.5MW of diesel generators," says Brian Beck, VP of Business Development at VRB Power Systems. "The VRB will be used to improve system stability and efficiency of generators; as well as allow for the deployment of additional wind turbines and reduce fuel usage and related green house gas emissions."
Related News
Wyoming wind boost for US utility
Top Senate Democrat calls for permanent renewable energy, storage, EV tax credits
California avoids widespread rolling blackouts as heat strains power grid
Scientists generate 'electricity from thin air.' Humidity could be a boundless source of energy.
New York and New England Need More Clean Energy. Is Hydropower From Canada the Best Way to Get it?
DOE Announces $28M Award for Wind Energy
Sign Up for Electricity Forum’s Newsletter
Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.
Electricity Today T&D Magazine Subscribe for FREE
- Timely insights from industry experts
- Practical solutions T&D engineers
- Free access to every issue