Slots for solar incentives fill quickly

subscribe

It took just 15 minutes for Pacific Power's share of Oregon's new solar power incentive program to fill up the first round.

"People compare it to getting tickets to a big rock show," Pacific Power spokesman Tom Gauntt told The Oregonian.

Among the winners was Mark Pengilly of Portland, who sat at his home computer and hit "send" on his application just as the clock struck 8 a.m. A member of Oregonians for Renewable Energy Policy, an organization that lobbied the Legislature for the program, he wants to power an electric or plug-in hybrid car with his planned 6.5-kilowatt system.

"I want to reduce the amount of carbon I contribute to the world," Pengilly said.

Portland General Electric and Idaho Power offers also filled quickly. PGE accepted 97 projects generating about 1 megawatt. Idaho Power approved 30 projects from Oregon customers totaling 200 kilowatts. The 75 small- and medium-size projects accepted by Pacific Power amount to 768 kilowatts.

The pilot program enacted by the Legislature offers 15-year contracts paying up to 65 cents per kilowatt hour, minus the current market rate, as an incentive to create enough solar power for 2,500 homes over the next four years. The second of eight rounds of enrollments opens October 1. The current market rate in Portland is about 8 cents per kilowatt hour.

Jonathan Cohen, principal and lead engineer for Imagine Energy, a Portland installer and consultant, cautioned that there are costs that many people don't understand.

The difference between incentive payments and the market rate are taxable. Systems must be insured for $1 million. Owners must pay $10 a month for an extra power meter. And as market rates rise, they will eat into the profits.

"Factoring in those things on a 3-kilowatt system adds costs of about $3,000," Cohen said. "Having lots of people excited about solar is wonderful, but we just don't want to have a backlash."

Known as a fee tariff, the premium rates are modeled on a European system. But unlike in Europe, solar producers cannot be paid for more than they produce.

Worried that private solar systems could amount to utilities, the Oregon Public Utilities Commission limited the amount of power that qualifies for the premium to the amount producers consume in a year. Monthly credits for excess power produced during sunny periods can be applied to cloudy months when more power is consumed than produced.

People who miss out on the premium rate can still qualify for other incentives. They include state and federal tax credits and a cash incentive.

Related News

downed trees and power lines

Hurricane Michael by the numbers: 32 dead, 1.6 million homes, businesses without power

FLORIDA - Hurricane Michael, a historic Category 4 storm, struck the Florida Panhandle early Wednesday afternoon, unleashing heavy rain, high winds and a devastating storm surge.

 

Here is a look at the dangerous storm by the numbers:

155 mph: Wind speed -- nearly the highest possible for a Category 4 hurricane -- with which Michael made landfall near Mexico Beach and Panama City. A hurricane with 157 mph or higher is a Category 5, the strongest on the Saffir-Simpson hurricane wind scale.

129 mph: Peak wind gust reported Wednesday at Tyndall Air Force Base, which is about 12 miles southeast of Panama City,…

READ MORE
quebec-usa-electricity

Americans aren't just blocking our oil pipelines, now they're fighting Hydro-Quebec's clean power lines

READ MORE

rolls royce nuclear

Rolls-Royce signs MoU with Exelon for compact nuclear power stations

READ MORE

Energize America: Invest in a smarter electricity infrastructure

READ MORE

power lines

California Regulators Face Calls for Action as Electricity Bills Soar

READ MORE