Slots for solar incentives fill quickly

subscribe

It took just 15 minutes for Pacific Power's share of Oregon's new solar power incentive program to fill up the first round.

"People compare it to getting tickets to a big rock show," Pacific Power spokesman Tom Gauntt told The Oregonian.

Among the winners was Mark Pengilly of Portland, who sat at his home computer and hit "send" on his application just as the clock struck 8 a.m. A member of Oregonians for Renewable Energy Policy, an organization that lobbied the Legislature for the program, he wants to power an electric or plug-in hybrid car with his planned 6.5-kilowatt system.

"I want to reduce the amount of carbon I contribute to the world," Pengilly said.

Portland General Electric and Idaho Power offers also filled quickly. PGE accepted 97 projects generating about 1 megawatt. Idaho Power approved 30 projects from Oregon customers totaling 200 kilowatts. The 75 small- and medium-size projects accepted by Pacific Power amount to 768 kilowatts.

The pilot program enacted by the Legislature offers 15-year contracts paying up to 65 cents per kilowatt hour, minus the current market rate, as an incentive to create enough solar power for 2,500 homes over the next four years. The second of eight rounds of enrollments opens October 1. The current market rate in Portland is about 8 cents per kilowatt hour.

Jonathan Cohen, principal and lead engineer for Imagine Energy, a Portland installer and consultant, cautioned that there are costs that many people don't understand.

The difference between incentive payments and the market rate are taxable. Systems must be insured for $1 million. Owners must pay $10 a month for an extra power meter. And as market rates rise, they will eat into the profits.

"Factoring in those things on a 3-kilowatt system adds costs of about $3,000," Cohen said. "Having lots of people excited about solar is wonderful, but we just don't want to have a backlash."

Known as a fee tariff, the premium rates are modeled on a European system. But unlike in Europe, solar producers cannot be paid for more than they produce.

Worried that private solar systems could amount to utilities, the Oregon Public Utilities Commission limited the amount of power that qualifies for the premium to the amount producers consume in a year. Monthly credits for excess power produced during sunny periods can be applied to cloudy months when more power is consumed than produced.

People who miss out on the premium rate can still qualify for other incentives. They include state and federal tax credits and a cash incentive.

Related News

doug ford

Hydro One stock has too much political risk to recommend, Industrial Alliance says

TORONTO - A seemingly positive development for Hydro One is overshadowed by ongoing political and regulatory risk, Industrial Alliance Securities analyst Jeremy Rosenfield says.

On October 4, staff from the Washington Utilities and Transportation Commission filed updated testimony in support of the merger of Hydro One and natural gas distributor Avista.

The merger, which was announced in July of 2017 has received the green light from federal and key states, with Washington, Oregon and Idaho being exceptions.

But Rosenfield says even though decisions from Oregon and Idaho are expected by December, there are still too many unknowns about Hydro One to recommend investors…

READ MORE
bc hydro sign

BC Hydro rates going up 3 per cent

READ MORE

nuclear reactors at Hinkley Point in Somerset

Hinkley C nuclear reactor roof lifted into place

READ MORE

Report: Solar ITC Extension Would Be ‘Devastating’ for US Wind Market

READ MORE

america-households-struggle-with-sky-high-energy-bills

American Households Struggle with Sky-High Energy Bills During Extreme Summer Heat

READ MORE