"Maintenance and upgrades are essential at our stations," said Tom Mitchell, Pickering B Site Vice President. "At regular intervals we take units off-line to inspect, maintain and upgrade various components as part of our station condition improvement program. Safely operating and maintaining our equipment pays dividends in improved station performance."
Prior to the outage, Unit 5 had been on line for 96 continuous days and last year Unit 5 had the best record at Pickering B with a unit capability factor(1) of over 92 per cent. The Unit has a rated capacity of 515 megawatts.
"The outage, which is scheduled to have the unit back in service to meet the hot summertime peaks in electricity demand, is one of our largest," added Mitchell. "Major work on the reactor side will include boiler cleaning, inspection and maintenance on fuel channels, the installation of new equipment in the main control room, and the inspection and repacking of a number of valves."
Work on the non-nuclear side of the station includes inspection and repair to a number of valves, work on the turbine generator, a major overhaul of a cooling water pump, and the overhaul of low pressure service water pumps.
Related News
P.E.I. government exploring ways for communities to generate their own electricity
Balancing Act: Germany's Power Sector Navigates Energy Transition
Fuel Cell Electric Buses Coming to Mississauga
UK Renewable Energy Auction: Boost for Wind and Tidal Power
Electricity is civilization": Winter looms over Ukraine battlefront
EDP Plans to Reject $10.9 Billion-China Three Gorges Bid
Sign Up for Electricity Forum’s Newsletter
Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.
Electricity Today T&D Magazine Subscribe for FREE
- Timely insights from industry experts
- Practical solutions T&D engineers
- Free access to every issue