Protective Relay Training - Basic
Our customized live online or in‑person group training can be delivered to your staff at your location.
- Live Online
- 12 hours Instructor-led
- Group Training Available
CSU said it's ready to apply for permits to build the wind farm on a Larimer County ranch owned by the university near the Wyoming border.
The university first announced plans for the wind farm in March 2007.
The operation would have at least 25 turbines. The electricity would not be fed directly to the campus but rather would flow into the broader power grid that the campus and other users draw from.
Bill Farland, CSU's vice president for research, says he's optimistic the wind farm can get approval, be constructed and be producing power within two years.
Related News
Europe's Thirst for Electricity Spurs Nordic Grid Blockade
Plan to End E-Vehicle Subsidies Sparks Anger in Germany
California lawmakers plan to overturn income-based utility charges
Canada's Electricity Exports at Risk Amid Growing U.S.-Canada Trade Tensions
EPA Policy to limit telework emerges during pandemic
In 2021, 40% Of The Electricity Produced In The United States Was Derived From Non-Fossil Fuel Sources
Sign Up for Electricity Forum’s Newsletter
Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.
Electricity Today T&D Magazine Subscribe for FREE
- Timely insights from industry experts
- Practical solutions T&D engineers
- Free access to every issue