CSA Z462 Arc Flash Training – Electrical Safety Compliance Course
Our customized live online or in‑person group training can be delivered to your staff at your location.
- Live Online
- 6 hours Instructor-led
- Group Training Available
CSU said it's ready to apply for permits to build the wind farm on a Larimer County ranch owned by the university near the Wyoming border.
The university first announced plans for the wind farm in March 2007.
The operation would have at least 25 turbines. The electricity would not be fed directly to the campus but rather would flow into the broader power grid that the campus and other users draw from.
Bill Farland, CSU's vice president for research, says he's optimistic the wind farm can get approval, be constructed and be producing power within two years.
Related News
Evidence Links Southern California Edison Transmission Line to Eaton Fire
SC nuclear plant on the mend after a leak shut down production for weeks
Germany should stop lecturing France on nuclear power, says Eon boss
Purdue: As Ransomware Attacks Increase, New Algorithm May Help Prevent Power Blackouts
Its Electric Grid Under Strain, California Turns to Batteries
Hydro One launches Ultra-Low Overnight Electricity Price Plan
Sign Up for Electricity Forum’s Newsletter
Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.
Electricity Today T&D Magazine Subscribe for FREE
- Timely insights from industry experts
- Practical solutions T&D engineers
- Free access to every issue