Elithis Tower produces more power than consumes


CSA Z462 Arc Flash Training – Electrical Safety Compliance Course

Our customized live online or in‑person group training can be delivered to your staff at your location.

  • Live Online
  • 6 hours Instructor-led
  • Group Training Available
Regular Price:
$249
Coupon Price:
$199
Reserve Your Seat Today

Elithis Tower showcases sustainable architecture in Dijon, a positive energy building using renewable energy, solar shading, triple-flow ventilation, energy recovery, smart sensors, and engaged user behavior to cut emissions and operational costs.

 

In This Story

Elithis Tower is a positive energy office in Dijon using passive design, solar shading, and energy recovery.

  • Positive energy building at cost parity with conventional
  • Wood facade, recycled insulation; minimal aluminum
  • Solar shield admits light, blocks glare and heat

 

The Elithis Tower, designed and constructed as the world's most environmentally sound building, has just been unveiled. Touted as the first positive energy office structure, the tower creates more power than it uses.

 

From design to material and user behaviour, the Elithis Tower applies the latest sustainable development techniques, such as smart building practices and is now open to journalists, academics and architects interested in studying or replicating this model.

Built in Dijon, France, the Elithis Tower was initially a theoretical challenge Thierry Bievre, General Director of the group Elithis Engineering, put forth to his team. Specialized in technical fluid installation and environmental efficiency, Bievre wanted to know whether it was possible to create an environmentally sound building, like emerging zero energy buildings at equal cost to a traditional structure.

Supported by the City of Dijon, France, and ADEME Bourgogne, France, Elithis Engineers called upon renowned architect Jean-Marie Charpentier (Arte Charpentier Architects, Paris, France) for close collaboration. Together, the group rose to the challenge to create the 54,000 square foot, ten story building which marries aesthetics, urban integration, comfort, energy and environmental performance.

To achieve this impressive combination, a complete environmental ideology was designed. Positive energy buildings produce more power than they consume, as seen in energy-producing workplaces and the Elithis Tower team strategically minimized energy consumption and maximized renewable energy use.

The Elithis teams committed to eliminating space waste. Materials for this project were chosen according to their global environmental impact. The exterior of the building is made of wood and recycled insulation, while aluminum, which strongly impacts the environmental, was used sparingly.

Bay windows were selected to bring in natural light. To complement this, a special nomad was designed by the Elithis team to guarantee a comfortable level of light is available without excess artificial illumination, where efficient options like LED lighting can further reduce demand.

To take advantage of solar energy (warmth and natural light) without the associated inconveniences (excess heat and blinding brightness) and aligned with net-zero design principles, a solar shield was designed by the Elithis engineers. Thanks to the unique design of this shield, natural light enters the building while excess heat and blinding light are filtered out.

In addition, a triple flow system has been patented by Elithis, which harmonizes energy in the building. Office energy emissions (from computers, photocopiers, lights, people...) are recovered, saved, harnessed and reused within the Elithis Tower, similar to net-zero seniors projects that balance use and production.

To match the engineering and architectural commitment to energy efficiency, everyone in the Elithis Tower, from owners, tenants, leaders and academics, to administrators, employees and visitors, is empowered to participate in the environmental efficiency of the project.

An increased level of consciousness is encouraged, meaning that people within the building are aware of their responsibility in energy consumption. Individuals will be inspired to make positive choices to minimize energy use (in terms of paper, water, transportation...) and reduce the environmental impact users have on their environment.

Because the Elithis Tower is such an innovative experience, the building is designed to facilitate evaluation and understanding, including documenting LEED payback methods adopted industry-wide. More than 1,600 sensors have been installed to meticulously examine and analyze energy and emissions. Daily energy consumption will be posted and displayed on a special public sign, in full transparency for building greenhouse gas emissions and environmental impact.

The Elithis Tower is the first active environmental laboratory of its kind and scientists, researchers and universities are invited to visit the Elithis Tower and evaluate the information collected in this project.

 

Related News

Related News

"Energy war": Ukraine tries to protect electricity supply before winter

Ukraine Power Grid Resilience details preparations for winter blackouts, airstrike defense, decentralized generation, backup generators,…
View more

AI Data Centers Push Power Grids as Energy Costs Rise

AI data centers are driving up electricity demand as companies scale artificial intelligence. Former Facebook…
View more

Barakah Unit 1 reaches 100% power as it steps closer to commercial operations, due to begin early 2021

Barakah Unit 1 100 Percent Power signals the APR-1400 reactor delivering 1400MW of clean baseload…
View more

Grounding and Bonding and The NEC - Section 250

Electrical Grounding and Bonding NEC 250 Training equips electricians with Article 250 expertise, OSHA compliance…
View more

5 ways Texas can improve electricity reliability and save our economy

Texas Power Grid Reliability faces ERCOT blackouts and winter storm risks; solutions span weatherization, natural…
View more

Hydro Quebec to increase hydropower capacity to more than 37,000 MW in 2021

Hydro Quebec transmission expansion aims to move surplus hydroelectric capacity from record reservoirs to the…
View more

Sign Up for Electricity Forum’s Newsletter

Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.

Electricity Today T&D Magazine Subscribe for FREE

Stay informed with the latest T&D policies and technologies.
  • Timely insights from industry experts
  • Practical solutions T&D engineers
  • Free access to every issue

Live Online & In-person Group Training

Advantages To Instructor-Led Training – Instructor-Led Course, Customized Training, Multiple Locations, Economical, CEU Credits, Course Discounts.

Request For Quotation

Whether you would prefer Live Online or In-Person instruction, our electrical training courses can be tailored to meet your company's specific requirements and delivered to your employees in one location or at various locations.