Stretching wire generates current

subscribe

Researchers at Georgia Tech have developed a new type of electric power generator able to produce AC current through cyclical stretching and releasing of zinc oxide wires. The new “flexible charge pump” generator is the fourth generation of devices designed to produce electrical current by using the piezoelectric properties of zinc oxide structures to harvest mechanical energy from the environment.

“The flexible charge pump offers yet another option for converting mechanical energy into electrical energy,” says Zhong Lin Wang, director of the Center for Nanostructure Characterization at the Georgia Institute of Technology. The generator can produce an oscillating output voltage of up to 45 millivolts. To boost the current produced, arrays of the flexible charge pumps could be constructed and connected in series. Multiple layers of the generators could also be stacked to form modules that could be implanted in the human body to power blood pressure sensors or other devices.

When the modules are mechanically stretched and released, the zinc oxide material generates a piezoelectric potential that alternately builds up and then is released. The wires are encapsulated in a flexible plastic substrate with two bonded ends; a Schottky barrier controls the alternating flow of electrons, and the piezoelectric potential is the driving force of the charge pump.

To measure generated electric energy in tests, researchers subjected the substrate and attached zinc oxide wires to periodic mechanical bending created by a motor-driven mechanical arm. Bending induces tensile strain, which creates a piezoelectric potential field along the laterally packaged wires. That in turn drives a flow of electrons into an external circuit, creating the alternating charge and discharge cycle – and corresponding current flow. Wang envisions a family of small-scale generators enabling development of a new class of self-powered wireless sensing systems that could gather, store, and transmit information without an external power source.

Related News

Chief Peter Collins, Fort William First Nation

Ontario First Nations urge government to intervene in 'urgently needed' electricity line

OTTAWA - Leaders of six First Nations are urging the Ontario government to "clean up" the bureaucratic process that determines who will build an "urgently needed" high-capacity power transmission line to service northern Ontario.

The proposed 450 kilometre East-West Transmission Project is set to stretch from Thunder Bay to Wawa, providing much-needed electricity to northern Ontario. NextBridge Infrastructure, in partnership with Bamkushwada Limited Partnership (BLP) — an entity the First Nations created in order to become co-owners and active participants in the economic development of the line — have been the main proponents of the project since 2012 and were awarded…

READ MORE
tidal power

Is tidal energy the surge remote coastal communities need?

READ MORE

sheerness power plant

Alberta gives $40M to help workers transition from coal power jobs

READ MORE

powerlines

Hydro One: No cut in peak hydro rates yet for self-isolating customers

READ MORE

Manitoba Hydro applying for 5 per cent interim rate increase

Consumers Coalition wants Manitoba Hydro?s proposed rate increase rejected

READ MORE