Electrical Commissioning In Industrial Power Systems
Our customized live online or in‑person group training can be delivered to your staff at your location.
- Live Online
- 12 hours Instructor-led
- Group Training Available
The Allentown-based utility says a worker fixing a water line was evacuated after higher-than-acceptable levels of nitrogen were detected inside the room. The worker had been using a device containing the gas at the time.
PPL says workers used the plant's ventilation system and fans to return oxygen levels to normal. They were then able to get into the room and shut off the source of the nitrogen, and the alert ended immediately after.
The company says both reactors at the plant continued to operate normally and no injuries were reported. PPL says a follow-up investigation will be done.
Related News
New England takes key step to 1.2 GW of Quebec hydro as Maine approves transmission line
California's future with income-based flat-fee utility bills is getting closer
Wasteful air conditioning adds $200 to summer energy bills, reveals BC Hydro
California's solar energy gains go up in wildfire smoke
Three New Solar Electricity Facilities in Alberta Contracted At Lower Cost than Natural Gas
Renewables surpass coal in US energy generation for first time in 130 years
Sign Up for Electricity Forum’s Newsletter
Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.
Electricity Today T&D Magazine Subscribe for FREE
- Timely insights from industry experts
- Practical solutions T&D engineers
- Free access to every issue