NFPA 70E Training - 2027 Edition
Our customized live online or in‑person group training can be delivered to your staff at your location.
- Live Online
- 6 hours Instructor-led
- Group Training Available
The Allentown-based utility says a worker fixing a water line was evacuated after higher-than-acceptable levels of nitrogen were detected inside the room. The worker had been using a device containing the gas at the time.
PPL says workers used the plant's ventilation system and fans to return oxygen levels to normal. They were then able to get into the room and shut off the source of the nitrogen, and the alert ended immediately after.
The company says both reactors at the plant continued to operate normally and no injuries were reported. PPL says a follow-up investigation will be done.
Related News
E.ON to Commission 2500 Digital Transformer Stations
TotalEnergies to Acquire German Renewables Developer VSB for US$1.65 Billion
California faces huge power cuts as wildfires rage
Customers on the hook for $5.5 billion in deferred BC Hydro operating costs: report
How Ukraine Will Keep the Lights On This Winter
Egypt, China's Huawei discuss electricity network's transformation to smart grid
Sign Up for Electricity Forum’s Newsletter
Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.
Electricity Today T&D Magazine Subscribe for FREE
- Timely insights from industry experts
- Practical solutions T&D engineers
- Free access to every issue