Surry nuclear reactor is shut down after transformers fail
Unit Two was shut down around 6 p.m. October 7 after steam blew out some sheet metal, which landed on a power line that serves one of the backup transformers, said Richard Zher, a spokesman for Dominion Resources Inc., the Richmond-based power company that owns the plant. Officials weren't sure what caused the second transformer to shut down, Zher said.
That first reserve electrical transformer was repaired, and Dominion was working on the second, Zher said. A third transformer was not affected.
Backup diesel generators kicked in when the two transformers shut down, Zher said.
Zher said Dominion was investigating what caused steam to blow out the siding in a building where cold water is turned into steam, which powers a turbine that creates electricity through a generator.
"Once we have made that determination and resolved any problems, we will restart" the reactor, Zher said.
The plant issued an alert, as required by federal guidelines, he said. "No one was injured and it didn't cause any threat to public health or safety," Zher said.
The Surry nuclear units produce 15 percent of the electricity in Dominion's service area.
Related News

California Blackouts reveal lapses in power supply
LOS ANGELES - One hallmark of an advanced society is a reliable supply of electrical energy for residential, commercial and industrial consumers. Uncertainty that California electricity will be there when we need it it undermines social cohesion and economic progress, as demonstrated by the travails of poor nations with erratic energy supplies.
California got a small dose of that syndrome in mid-August when a record heat wave struck the state and utilities were ordered to impose rolling blackouts to protect the grid from melting down under heavy air conditioning demands.
Gov. Gavin Newsom quickly demanded that the three overseers of electrical service…