Atlin group fights Yukon Energy dam plans

ATLIN LAKE, BRITISH COLUMBIA - People in the northwestern British Columbia community of Atlin are opposing Yukon Energy Corp.'s proposal to build a dam that residents say would affect a local lake.

Engineers with the Yukon's public utility are in their first year of field studies on the Atlin River, trying to determine if a weir or dam on the river could hold back the fall runoff from Atlin Lake.

Yukon Energy wants to control the fall drainage so more water is retained for the winter, when the utility would need it for hydroelectric production.

But some residents in the remote community of about 400 say Yukon Energy's field studies are a waste of money, since they would never allow the corporation to build a control structure on their waterways.

"Atlin Lake is the largest natural body of water in B.C. and it is, at this stage, pristine and untouched," Penny Wallis, who lives on the Atlin waterfront, told CBC News.

"If we let anyone begin to do things to this lake, then it could be the end of it. I am totally against this project."

Atlin is located in the far northwestern corner of B.C., about 180 kilometres southeast of Whitehorse.

While Yukon Energy has opened a temporary part-time office in Atlin to keep the community posted about its field work, some residents are forming the Protect Atlin Lake Society to oppose the whole project.

"I hope we can cut it off at the knees, frankly," said Wayne Merry, a longtime Atlin resident and a member of the society.

Yukon Energy says it needs at least one more year of field work on the Atlin River. Merry said the millions of dollars the utility has budgeted for the studies could be better spent elsewhere.

"I know they're investing," he said. "We've talked to them about that and said, 'Look, why waste this money?' Because this is not going to happen."

The society has written to B.C. Environment Minister Barry Penner, raising numerous environmental concerns they have with the Yukon Energy project. The group wants the Atlin River to be designated as a special protected area, adjacent to Atlin Provincial Park.

Related News

tunisia solar panels

ABO to build 10MW Tunisian solar park

TUNISIA - ABO Wind has received a permit and a tariff for a 10MW photovoltaic project in Tunisia which it plans to build and commission in 2020.

The solar park, in the governorate of Gabes, is 400km south of the country’s capital Tunis.

The developer said it plans to build the project next year in close cooperation with local partners.

ABO Wind department head Nicolas Konig said: “The solar park will produce more than 18 million kilowatt hours of electricity per year and will feed it into the grid at a distance of 2500 metres.”

The developer will conclude an electricity supply contract with…

READ MORE
strong-winds-knock-out-power-across-miami-valley

Strong Winds Knock Out Power Across Miami Valley

READ MORE

coal plant

18% of electricity generated in Canada in 2019 came from fossil fuels

READ MORE

In North Carolina, unpaid electric and water bills are driving families and cities to the financial brink

READ MORE

Ontario election

Clean, affordable electricity should be an issue in the Ontario election

READ MORE