NFPA 70E Training
Our customized live online or in‑person group training can be delivered to your staff at your location.
- Live Online
- 6 hours Instructor-led
- Group Training Available
The 179-page feasibility study said coal-to-liquids technology can work in a northern environment. Based on $120 per barrel crude oil, the report concluded, a plant would be financially viable.
Even with declining oil prices, such a project could pan out as a public-private partnership, said development corporation CEO Jim Dodson.
The development corporation commissioned the $550,000 study in May from Toronto-based Hatch Ltd. The report was paid for by a $300,000 state appropriation and $250,000 from the Fairbanks North Star Borough.
A coal-to-liquids plant could cost between $4 billion and $7.4 billion, depending on output volume and feedstock. Plans envision using Healy coal, but the study indicated that a combination of coal and natural gas could significantly cut harmful byproducts, including fly ash, slag and carbon dioxide.
The plant also could produce useful byproducts. Tremendous quantities of steam could feed district steam heat lines at Eielson, Fort Wainwright and even Fairbanks. The facility would generate all 120 megawatts or so of electricity needed for operations, and have around 40 megawatts left to shoot into Golden Valley Electric Association's grid.
Dodson cautioned that the feasibility report is only 3 to 4 percent of the total engineering needed for a project.
"It's on the preliminary end of this, but it is a necessary step we had to go through," he said.
Related News
IAEA Warns of Nuclear Risks from Russian Attacks on Ukraine Power Grids
Typical Ontario electricity bill set to increase nearly 2% as fixed pricing ends
Rising Electricity Prices: Inflation, Climate Change, and Clean Energy Challenges
The City of Vancouver is hosting an ABB FIA Formula E World Championship race next year, organizers have announced
Hundreds facing hydro disconnection as bills pile up during winter ban
Saudis set to 'boost wind by over 6GW'
Sign Up for Electricity Forum’s Newsletter
Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.
Electricity Today T&D Magazine Subscribe for FREE
- Timely insights from industry experts
- Practical solutions T&D engineers
- Free access to every issue