AREVA to power ALCANÂ’s new plant in Canada
Under the contract worth over 100 million euros, AREVA will build a highvoltage power rectifier station that will convert the incoming alternating current into direct current, required for the aluminum production process. The station will be delivered by September 2009.
AREVAÂ’s Transmission and Distribution division is currently number two worldwide on the aluminum power segment. This contract will help the division reach its global objective for the electro-intensive industries market: to double its order intake by 2010.
AREVA T&D has been partnering with ALCAN for over 30 years and is currently building a power supply system for its production sites located in Saint Jean de Maurienne and Dunkerque in France.
Philippe Guillemot, Chairman and CEO of AREVA T&D, said “This success is the logical continuation of our long-term cooperation with ALCAN. This win also demonstrates our ability to meet the specific needs of electro-intensive industry customers and represents another breakthrough in our strategy to grow on this market.”
Related News

UK price cap on household energy bills expected to cost 89bn
LONDON - Liz Truss’s intervention to freeze energy prices for households for two years is expected to cost the government £89bn, according to the first major costing of the policy by the sector’s leading consultancy.
The analysis from Cornwall Insight, seen exclusively by the Guardian, shows the prime minister’s plan to tackle the cost of living crisis could cost as much as £140bn in a worst-case scenario.
Truss announced in early September that the average annual bill for a typical household would be capped at £2,500 to protect consumers from the intensifying cost of living crisis and a scheduled 80% rise in…