Tajik capital, outskirts face power blackout


CSA Z462 Arc Flash Training – Electrical Safety Compliance Course

Our customized live online or in‑person group training can be delivered to your staff at your location.

  • Live Online
  • 6 hours Instructor-led
  • Group Training Available
Regular Price:
$249
Coupon Price:
$199
Reserve Your Seat Today
Strict restrictions on electricity supplies have again been imposed in Tajikistan.

Asia-Plus has learnt at the Tajik Ministry of Energy and Industry that the restrictions were imposed in connection with the forthcoming ceremony to block the River Vakhsh at the construction site of the Sangtuda-1 hydroelectric power station on December 15.

On that day, the power supply will be completely stopped in Tajikistan. According to information from Tajik power engineers, the power blackout will last for two days, until the evening of December 17. The restrictions will also affect the capital (Dushanbe).

Asia-Plus has learnt from the Dushanbe city administration that the supply of electricity will be suspended to residential areas on the city's outskirts, except for the city centre where vital facilities are situated, in accordance with a timetable between 2300 and 0500 (local time; 1800-2200 gmt) from December 12-20.

The city administration has given an assurance that the power supply to the residential areas will be cut off temporarily in the daytime. The source said that in this connection, the city mayor, Mahmadsaid Ubaydulloyev, had tasked Dushanbegaz (Dushanbe gas supply company) with increasing the supply of natural gas to the capital's inhabitants and to social facilities during these days.

According to specialists from the Ministry of Energy and Industry, the Norak hydroelectricity power station will reduce its electricity generating capacity by 50 per cent during the days when the river is blocked, and it will gradually increase it only after 20 December.

"All the details have been calculated and the builders of Sangtuda have to complete all the work within two days," the source added.

"Currently, the electricity generation across the country amounts to 41.575m kWh, of which 29m kWh (69 per cent) is generated by the Norak power station. We rely on the Dushanbe heating plant (for electricity supplies), which generates about 3m kWh (electricity) a day," a source at the Barq-i Tojik (Tajik electricity joint-stock company) said.

Related News

Alberta Introduces New Electricity Rules

Alberta Rate of Last Resort streamlines electricity regulations to stabilize the default rate, curb price…
View more

Japan to host one of world's largest biomass power plants

eRex Biomass Power Plant will deliver 300 MW in Japan, offering stable baseload renewable energy,…
View more

Ireland goes 25 days without using coal to generate electricity

Ireland Coal-Free Electricity Record: EirGrid reports 25 days without coal on the all-island grid, as…
View more

Data Show Clean Power Increasing, Fossil Fuel Decreasing in California

California clean electricity accelerates with renewables as solar and wind surge, battery storage strengthens grid…
View more

Europe's Worst Energy Nightmare Is Becoming Reality

European Energy Crisis shocks markets as Russia slashes gas via Nord Stream, spiking prices and…
View more

DP Energy Sells 325MW Solar Park to Medicine Hat

Saamis Solar Park advances Medicine Hat's renewable energy strategy, as DP Energy secures AUC approval…
View more

Sign Up for Electricity Forum’s Newsletter

Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.

Electricity Today T&D Magazine Subscribe for FREE

Stay informed with the latest T&D policies and technologies.
  • Timely insights from industry experts
  • Practical solutions T&D engineers
  • Free access to every issue

Download the 2026 Electrical Training Catalog

Explore 50+ live, expert-led electrical training courses –

  • Interactive
  • Flexible
  • CEU-cerified