CSA Z463 Electrical Maintenance -
Our customized live online or in‑person group training can be delivered to your staff at your location.
- Live Online
- 6 hours Instructor-led
- Group Training Available
Cenace exported 80MW/h on Monday, which represents earnings of US$21,600 for local generators with Colombian distributors paying Ecuadorian generators US$0.03 - 0.032/kWh.
The line, which has been operating since March 1, was previously only exporting power from Colombia to Ecuador. The interconnection supplied 13% of Ecuador's national electricity demand in March.
Prices in Ecuador have fallen by 26% since the line started operating on March 1, which represents a saving of US$26.8mn for local distributors in the first month.
For now, Ecuador is only exporting power to Colombia during periods of low domestic demand, but that could change in 10-15 days once line adjustments are completed in the Totoras and Santa Rosa sectors and Ecuador's export capacity increases from 80MW/h to 150MW/h.
Ecuador's major hydro generators are the 1,075MW Paute plant, the 150MW Agoyan plant and the 70MW Pisayambo plant. - (BNamericas.com)
Related News
Energy groups warn Trump and Perry are rushing major change to electricity pricing
Alberta Leads the Way in Agrivoltaics
UK to End Coal Power After 142 Years
New fuel cell could help fix the renewable energy storage problem
The crisis in numbers: How COVID-19 has reshaped Saskatchewan
B.C. electricity demand hits an all-time high
Sign Up for Electricity Forum’s Newsletter
Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.
Electricity Today T&D Magazine Subscribe for FREE
- Timely insights from industry experts
- Practical solutions T&D engineers
- Free access to every issue