NFPA 70b Training - Electrical Maintenance
Our customized live online or in‑person group training can be delivered to your staff at your location.
- Live Online
- 12 hours Instructor-led
- Group Training Available
In a draft order issued, FERC dismissed arguments by the NY-ISO and Consolidated Edison, the utility serving New York City, that the practice of shifting generation resources during severe weather benefits the entire state.
“Thunderstorm Alert” procedures developed by the New York State Reliability Council prior to the establishment of the NY-ISO stated that because Con Ed’s transmission and distribution system is vulnerable to storm-caused disruptions, more expensive generation resources in New York City and Long Island should be used in place of cheaper resources in upstate New York when storms threaten or occur in Con Ed’s service territory. Storms would theoretically limit the amount of power Con Ed could import from upstate sources, forcing the utility to rely on nearby sources.
FERC accepted the thunderstorm alert procedures when it approved the NY-ISOÂ’s market rules and tariff, but urged the ISO to consider alternatives. Last October, the ISO submitted a report saying the current procedure is appropriate. But the commission disagreed.
“On the merits, the commission finds that the current allocation of thunderstorm alert-related costs is unjust and unreasonable,” the draft order says. “These procedures are mandated by a local reliability rule designed to prevent recurrence of a major blackout in New York City, and which were, prior to the formation of the NY-ISO, the sole responsibility of Con Ed. The specific reliability benefits from these procedures inure solely to benefit New York City load, so that the costs should be allocated solely to that load.”
By spreading costs throughout the state, FERC said Con Ed has no real incentive to try to minimize the costs. The ISOÂ’s consultant, LECG, studied the storm cost issue and suggested two alternatives to the current cost allocation structure: assigning all costs to New York City load; or assigning all costs to both New York City and Long Island load, because some of the power plants that would be called on are located on Long Island. The Long Island Power Authority objected, saying only New York City benefits from the storm procedures. FERC in the draft order agreed with LIPA.
Related News
Military Is Ramping Up Preparation For Major U.S. Power Grid Hack
Canadian Gov't and PEI invest in new transmission line to support wind energy production
Maryland’s renewable energy facilities break pollution rules, say groups calling for enforcement
Massive power line will send Canadian hydropower to New York
UK homes can become virtual power plants to avoid outages
Energy Vault Lands $110M From SoftBank’s Vision Fund for Gravity Storage
Sign Up for Electricity Forum’s Newsletter
Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.
Electricity Today T&D Magazine Subscribe for FREE
- Timely insights from industry experts
- Practical solutions T&D engineers
- Free access to every issue