Entrepreneur demonstrates portable power prototype


NFPA 70b Training - Electrical Maintenance

Our customized live online or in‑person group training can be delivered to your staff at your location.

  • Live Online
  • 12 hours Instructor-led
  • Group Training Available
Regular Price:
$699
Coupon Price:
$599
Reserve Your Seat Today

Portable Geothermal ORC Plant converts waste heat via the organic Rankine cycle into distributed, zero-emissions electricity for microgrids, oilfields, and district heating, using modular trucks for rapid deployment and minimal maintenance.

 

Breaking Down the Details

A modular ORC system that turns low-grade waste heat into 200 kW-class, zero-emissions power for decentralized sites.

  • 200 kW demo fed Fairbanks grid from Aurora's waste hot water
  • Organic Rankine cycle using low-boiling working fluid
  • Fits on two flatbed trucks; rapid, modular deployment

 

Bernie Karl is looking to redefine how electricity is delivered.

 

Karl, a mechanic and owner of Chena Hot Springs Resort, plans to market a portable geothermal power plant in an energy marketplace, where geothermal is heating up rapidly, yielding increasing numbers of alternative energy ideas.

The project's technology mirrors that of Karl's four-year-old geothermal plant at Chena Hot Springs east of Fairbanks, and Oregon college drilling efforts underscore the expanding field. Where the resort's power plant took up a building, the prototype fits on two flatbed trucks.

Karl recently demonstrated the prototype in downtown Fairbanks, near the back doors of Aurora Energy's Chena Power Plant. Hot water — a byproduct of the Aurora plant — fed Karl's mobile ORG (organic Rankine Cycle) plant, akin to the ElectraTherm Green Machine approach, which spit 200 kilowatts of electricity into Fairbanks' power grid.

The Rankine Cycle is the basis of most modern electric power plants, and early pioneers such as the grandfather of geothermal applied similar principles; a heat source boils water to create steam, which turns a turbine. The steam then travels through pipes into a condenser, which converts the steam back into water, and the process repeats.

Because the water at Chena Hot Springs isn't boiling hot when it comes out of the ground, Karl designed a power plant that uses a chemical with a lower boiling point, as new thermal technologies come online across the industry. The hot water heats up the chemical, which turns into steam and works the same as in an ordinary Rankine Cycle.

"You hear that? It's purring like a kitten in a creamery," Karl said. The demonstration is producing free electricity for Aurora without emissions, he said.

A business team will next send the prototype — built to operate from atop the two trucks — to Las Vegas, Wyoming, and then Florida for commercial demonstrations, even as geothermal power in the Upper Ark gains attention. The business team consists of Quantum Resources Management, Pratt & Whitney Power Systems, United Technologies Research Center and Karl's Chena Power.

In Florida, the power plant will use hot water created as a byproduct of oil extraction. In preparation for that test, Karl incorporated an oil-and-water separator into the prototype design.

Karl said he hopes to build and lease around 1,000 models in the next three years with Chena Power. He estimates each plant will cost roughly $300,000 or $400,000 to build. Karl said the demonstration work will help potential clients see that each plant needs only minimal maintenance, can operate self-contained at an average oil well, and doesn't need permits for ground work or construction.

Because it feeds on water heated by the Earth, Karl calls geothermal a "second bite at the energy apple." His demonstration downtown actually represented a third bite: It ran on leftover hot water at the Aurora plant's district heat system, similar to Oregon geothermal heating approaches, which itself employs waste heat from the plant's electric generation to heat a few hundred downtown homes and buildings.

Related News

Opponent of Site C dam sharing concerns with northerners

Site C Dam Controversy highlights Peace River risks, BC Hydro claims, Indigenous rights under Treaty…
View more

Ex-SpaceX engineers in race to build first commercial electric speedboat

Arc One Electric Speedboat delivers zero-emission performance, quiet operation, and reduced maintenance, leveraging battery propulsion,…
View more

Construction starts on disputed $1B electricity corridor

New England Clean Energy Connect advances despite court delays, installing steel poles on a Maine…
View more

Atlantica - Regulatory Reform To Bring Greener Power To Atlantic Canada

Atlantic Canada Energy Regulatory Reform accelerates smart grids, renewables, hydrogen, and small modular reactors to…
View more

Could selling renewable energy be Alberta's next big thing?

Alberta Renewable Energy Procurement is surging as corporate PPAs drive wind and solar growth, with…
View more

Britain's National Grid Drops China-Based Supplier Over Cybersecurity Fears

National Grid Cybersecurity Component Removal signals NCSC and GCHQ oversight of critical infrastructure, replacing NR…
View more

Sign Up for Electricity Forum’s Newsletter

Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.

Electricity Today T&D Magazine Subscribe for FREE

Stay informed with the latest T&D policies and technologies.
  • Timely insights from industry experts
  • Practical solutions T&D engineers
  • Free access to every issue

Download the 2026 Electrical Training Catalog

Explore 50+ live, expert-led electrical training courses –

  • Interactive
  • Flexible
  • CEU-cerified