Spill Containment RFQ

Request quotes for transformer and substation spill containment, including secondary containment berms, containment pits, prefabricated liners, and retrofit containment for existing equipment.

Complete only the fields you know. If you have a site plan, equipment nameplate, or regulatory requirement document, upload it near the end of this form.
  • Fire-Rated
  • Oil/Water Separator
  • Retrofit
  • SPCC Compliance
  • Turnkey Installation

Spill Containment RFQ Intake

This form is built for electric utilities, industrial facility owners, EPCs, and substation contractors sourcing spill containment systems for oil-filled transformers and substation equipment.

  • Containment type — berm, pit, liner, portable, or retrofit
  • Equipment type, fluid volume, and site conditions
  • Design requirements — capacity, drainage, fire rating
  • Installation scope, regulatory compliance, and documentation

For New Substation Construction

Specify equipment type, fluid volume, and design requirements for containment integrated into a new substation build.

For Retrofit of Existing Equipment

Capture existing equipment age, site access conditions, and installation scope needed to add containment around energized equipment with no existing containment.

For Regulatory Compliance Deadlines

Provide urgency, applicable standards, and documentation requirements for containment driven by an EPA SPCC or state environmental compliance deadline.

1. Containment Type and Application

Select the spill containment system needed. Oil-filled transformers and substation equipment typically require secondary containment sized to hold the full fluid volume plus fire suppression water.

Containment Type

2. Equipment and Site Details

Identify the equipment being contained and site conditions.

Equipment Type

3. Design and Technical Requirements

Specify containment capacity, drainage, and design requirements.

Design Requirements

4. Installation and Site Preparation

Specify installation scope and site preparation requirements.

Installation Scope

5. Standards and Regulatory Compliance

Select applicable environmental and regulatory standards.

Standards and Compliance

6. Timeline and Commercial Terms

Specify urgency, scheduling, and commercial requirements.

7. Contact, Delivery, Uploads, and Notes

Quote Type
Support Required

Upload one-line diagrams, equipment lists, relay settings, utility fault current, previous studies, models, drawings, RFP documents, site standards, or photos.

Download the 2026 Electrical Training Catalog

Explore 50+ live, expert-led electrical training courses –

  • Interactive
  • Flexible
  • CEU-cerified