Huge nuclear plant in the works


CSA Z462 Arc Flash Training – Electrical Safety Compliance Course

Our customized live online or in‑person group training can be delivered to your staff at your location.

  • Live Online
  • 6 hours Instructor-led
  • Group Training Available
Regular Price:
$249
Coupon Price:
$199
Reserve Your Seat Today
The first nuclear power plant to be built in Ontario in more than 20 years could be more than three times larger than what the Liberal government said was needed when it first outlined its nuclear plan in 2006.

Environmentalists are calling it a classic "bait-and-switch" aimed at avoiding a public backlash when the plan was first announced.

According to a request for proposals to build the new plant, the province is now looking to construct "a stand-alone, two-unit nuclear power plant... to provide roughly 2,000-3,500 (megawatts) of baseload generation capacity."

The call for bids was issued last week to federally owned Atomic Energy of Canada Ltd. and three foreign nuclear-reactor companies that made a short list.

A 3,500-megawatt plant would be one of the largest nuclear projects in the world, roughly equal to the size of the existing generating station at Darlington, and would be big enough to power all homes and businesses in Toronto. It would be located either at Darlington or the Bruce generating station near Kincardine. The document also asks that proposals give the government the "option" to build one or two additional reactors.

Energy Minister Gerry Phillips told the Star that the original target was to build 1,400 megawatts, envisioned at the time as two 700-megawatt Candu reactors.

"It's always been that we're going to build a plant with two reactors," Phillips said. "The average size of the plants has gone up. At the time (reactors) were 700 megawatts.... Now reactors are more 1,000 megawatts to 1,600 megawatts."

Estimates for new nuclear plants are anywhere between $8 billion and $15 billion. But rising costs for labour and materials make the figure a moving target. Electricity customers will foot the bill, but Queen's Park is adamant that the bulk of any cost overruns is expected to be shouldered by the winning bidder.

Phillips said it's more economical to build reactors in pairs. "People expect us to plan for contingencies, so I don't really apologize for what's in the request for proposal," Phillips added. "It's just good planning to ask for those numbers."

But former energy minister Dwight Duncan, in an Aug. 26, 2006, interview with the Star, made the government's original intention clear. "The best advice we've had is right now we need 1,000 megawatts of new nuclear built, and we'll go from there."

Duncan said then that the numbers could go up if existing plants were deemed uneconomical to refurbish, but that overall nuclear capacity would not exceed 14,000 megawatts. Most reactors under consideration at that time, both foreign and domestic, ranged in size from 1,000 megawatts to 1,600 megawatts each.

Keith Stewart, an environmentalist with WWF-Canada, said past talk of refurbishing existing plants has been masking the government's real intentions around nuclear.

"Politically, refurbishments are a much easier sell," said Stewart. "So you say it's only going to be a little bit and then ‘Oops!’ – it's much more. We're going to see this more down the road when the costs start coming in."

He added that a process that asks for at least 2,000 megawatts of new nuclear capacity is an admission that the reactors at Pickering B won't be refurbished, even though a decision from Ontario Power Generation isn't expected until next year.

The request to build more nuclear capacity may be controversial for electricity consumers, but it means more business for the winning bidder, which will emerge from a short list of four reactor companies that include AECL, France's Areva NP, and U.S. nuclear-power giants GE-Hitachi Nuclear Energy and Westinghouse Electric.

The decision to open the process to the international community represents a ground-shift in a province that in the past has fulfilled its duty to shop locally, even if it meant being a guinea pig for projects such as Darlington, that were late and dramatically over budget.

A winner is expected by the end of this year, with the goal of getting shovels in the ground in 2012 and electricity on transmission lines by 2018.

The government is also expected to decide by year's end whether Ontario Power Generation or Bruce Power will be the operator of the new plant.

Related News

Iran, Iraq Discuss Further Cooperation in Energy Sector

Iran-Iraq Electricity Cooperation advances with power grid synchronization, cross-border energy trade, 400-kV transmission lines, and…
View more

Alliant aims for carbon-neutral electricity, says plans will save billions for ratepayers

Alliant Energy Net-Zero Carbon Plan outlines carbon-neutral electricity by 2050, coal retirements by 2040, major…
View more

California Skirts Blackouts With Heat Wave to Test Grid Again

California Heatwave Power Crisis strains CAISO as record demand triggers emergency alerts, demand response, and…
View more

Power Outage Disrupts Morning Routine for Thousands in London

London, Ontario Power Outage disrupts the electricity grid, causing a citywide blackout, stalled commuters, dark…
View more

US Automakers Will Build 30,000 Electric Vehicle Chargers

Automaker EV Fast-Charging Network will deploy 30,000 DC fast chargers across US and Canada, supporting…
View more

Toronto Prepares for a Surge in Electricity Demand as City Continues to Grow

Toronto Electricity Demand Growth underscores IESO projections of rising peak load by 2050, driven by…
View more

Sign Up for Electricity Forum’s Newsletter

Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.

Electricity Today T&D Magazine Subscribe for FREE

Stay informed with the latest T&D policies and technologies.
  • Timely insights from industry experts
  • Practical solutions T&D engineers
  • Free access to every issue

Download the 2026 Electrical Training Catalog

Explore 50+ live, expert-led electrical training courses –

  • Interactive
  • Flexible
  • CEU-cerified