Solar energy plants use too much water


CSA Z462 Arc Flash Training – Electrical Safety Compliance Course

Our customized live online or in‑person group training can be delivered to your staff at your location.

  • Live Online
  • 6 hours Instructor-led
  • Group Training Available
Regular Price:
$249
Coupon Price:
$199
Reserve Your Seat Today
Congress' rush to embrace solar power is having some unintended consequences. It will turn over a large chunk of federal land to private energy companies, and it may involve withdrawing billions of gallons of water from sensitive desert habitat.

By 2015, Congress wants the Interior and Energy Departments to place, on federal land, renewable energy projects that can generate at least 10,000 megawatts of electricity. The Energy Policy Act of 2005 has set off a frantic land grab as solar and wind energy companies rush to obtain permits for projects in Arizona, California, Colorado, Nevada, New Mexico and Utah.

As of mid-March, the Bureau of Land Management had received 158 applications for permits for solar power plants, covering more than one million acres of land — an area larger than Rhode Island. Most of the proposed plants are located near the border of Arizona, California and Nevada. This area of the Mojave Desert seems perfect for solar power; it's hot and flat and vast. What the Mojave Desert doesn't have is water.

Most people think of solar power as the flat panels on a neighbor's roof that are used to heat water. This photovoltaic system directly converts the sun's waves into electricity. But so far, it's not commercially feasible. The power is costly and there's no juice at night, but utilities want cheap power 24/7. On the plus side, photovoltaic solar uses almost no water.

In contrast, most large solar power projects use a system called concentrating solar power, or CSP, that heats a fluid that boils water to turn a turbine. CSP, just like any thermal power plant, produces waste heat as a byproduct. In most cases, cooling towers release the heat to the atmosphere through evaporation, a process that uses gobs of water. In fact, CSP uses four times as much water as a natural gas plant and twice as much as a coal or nuclear plant.

It is possible to use an air-cooled system, but CSP plants in the Mojave Desert face an obvious problem: It's hot outside, which makes air cooling inefficient. According to a 2007 DOE report, dry-cooled CSP plants take up more space, cost almost 10 percent more to build and generate 5 percent less electricity. Given that solar power is competing with low-cost natural gas and coal-fired plants, power companies would naturally prefer to use wet-cooling systems.

The National Park Service, which is concerned about the impact of wet-cooled plants on endangered species in southern Nevada, wants the federal government to deny permits for water-cooled plants. Air-cooling would cut the water use by 80 to 90 percent.

The Park Service is right. As the process moves forward, the administration should insist that CSP plants embrace air-cooling. There is no reason to permit hundreds of new groundwater wells to be drilled in the Mojave Desert. It doesn't have the water.

Related News

Bitcoin mining uses so much electricity that 1 city could curtail facility's power during heat waves

Medicine Hat Bitcoin Mining Facility drives massive electricity demand and energy use, leveraging natural gas…
View more

Wall Street Backs Rick Perry’s $19 Billion Data Center Venture

Wall Street backs Rick Perry’s $19 billion nuclear-powered data center venture, Fermi America, combining nuclear…
View more

UK families living close to nuclear power stations could get free electricity

UK Nuclear Free Electricity Incentive proposes community benefits near reactors, echoing France, supporting net zero…
View more

Brazilian electricity workers call for 72-hour strike

Eletrobras Privatization Strike sparks a 72-hour CNE walkout by Brazil's electricity workers, opposing asset sell-offs…
View more

Overturning statewide vote, Maine court energizes Hydro-Quebec's bid to export power

Maine Hydropower Transmission Line revived by high court after referendum challenge, advancing NECEC, Hydro-Quebec supply,…
View more

Honda Accelerates Electric Vehicle Push with Massive Investment in Ontario

Honda Ontario EV Investment accelerates electric vehicle manufacturing in Canada, adding a battery plant, EV…
View more

Sign Up for Electricity Forum’s Newsletter

Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.

Electricity Today T&D Magazine Subscribe for FREE

Stay informed with the latest T&D policies and technologies.
  • Timely insights from industry experts
  • Practical solutions T&D engineers
  • Free access to every issue

Live Online & In-person Group Training

Advantages To Instructor-Led Training – Instructor-Led Course, Customized Training, Multiple Locations, Economical, CEU Credits, Course Discounts.

Request For Quotation

Whether you would prefer Live Online or In-Person instruction, our electrical training courses can be tailored to meet your company's specific requirements and delivered to your employees in one location or at various locations.