NASA Moon Base would run on Solar Panels

LONG BEACH, CALIFORNIA - NASA announced new details about its plans for a Moon base that included a pair of small, pressurized rovers with a range of nearly 600 miles.

The space agency plans to return astronauts to the Moon around 2020. Agency officials first described proposals last December for a polar lunar base powered by near constant sunlight on solar panels.

Earlier proposals to carry small habitation modules to the Moon in stages might be supplanted by a proposal that would heave a single large module to the Moon on an unmanned cargo ship, Doug Cooke, the NASA official leading the lunar study group, said.

The new rover would not be much larger than the buggies the Apollo astronauts drove, but would be pressurized so that astronauts could drive in shirt sleeves and be protected from radiation — probably by a layer of water in the rover’s body, said Geoff Yoder, an official working on the lunar plans. To explore on foot, astronauts would put on spacesuits and leave the vehicle, Mr. Yoder said. The cost? “More than a Ferrari,” he joked.

The scientists said they had also discussed nuclear energy as a power supply for the habitat, since that might be necessary for building a successful encampment on Mars. But, Mr. Cooke said, the initial power source for the lunar base “should be solar.” They have also discussed making the lunar lander and habitat mobile so that the base could be moved for exploration of other areas in what is being called “super sortie” mode, he said.

The updated plans were discussed at a conference of the American Institute of Aeronautics and Astronautics in Long Beach, Calif.

Related News

 Colin Mulvey, Project Manager

Scottish North Sea wind farm to resume construction after Covid-19 stoppage

GLASGOW - Neart Na Gaoithe (NnG) Offshore Wind Farm, owned by  EDF Renewables and Irish firm ESB, stopped construction in March.

Project boss Matthias Haag announced last night the 54-turbine wind farm would restart construction this week.

Located off Scotland’s east coast, it was awarded a Contract for Difference (CfD) in 2015 and will look to generate enough energy to power 375,000 homes.

It is expected to create around 500 jobs while also delivering £540 million to the local economy.

Mr Haag, NnG project director, said the wind farm build would resume with a small, staggered workforce return in line social distancing rules.

He added:…

READ MORE
electric vehicles

Coronavirus puts electric carmakers on alert over lithium supplies

READ MORE

nuclear power

BC residents split on going nuclear for electricity generation: survey

READ MORE

Trump Is Seen Replacing Obama’s Power Plant Overhaul With a Tune-Up

READ MORE

With a Focus on Local Response, PG&E Prepares for Winter Storm Season

READ MORE