CSA Z463 Electrical Maintenance -
Our customized live online or in‑person group training can be delivered to your staff at your location.
- Live Online
- 6 hours Instructor-led
- Group Training Available
The tender is for the supply, installation and servicing of 20 turbines with a capacity of 2 MW each at its Wicko wind farm as well as a 110 kV substation. The total cost was estimated at 200 million zloty US $62.54 million.
"Tauron is starting to develop wind energy power," it said in a statement. "The group plans to start wind farms totaling 440 MW until 2020."
The company has 131 MW of installed renewable capacity from 35 hydro plants that produced 0.9 TWh of power in 2009. Tauron said the company plans to triple the amount of energy it generates through renewable sources by 2020.
Tauron, which operates in the heavily industrialized region of Silesia, is Poland's top power distributor and generates about 13 percent of its production.
Related News
Quebec Hit by Widespread Power Outages Following Severe Windstorm
Time running out for Ontario to formally request Pickering nuclear power station extension
Almost 500-mile-long lightning bolt crossed three US states
NT Power Penalized $75,000 for Delayed Disconnection Notices
Can the Electricity Industry Seize Its Resilience Moment?
California Considers Revamping Electricity Rates in Bid to Clean the Grid
Sign Up for Electricity Forum’s Newsletter
Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.
Electricity Today T&D Magazine Subscribe for FREE
- Timely insights from industry experts
- Practical solutions T&D engineers
- Free access to every issue