Utilities testing new smart device for homes
The project is a one-year Technology Demonstration of ASEÂ’s RetroSAVE product in 35 homes across Ontario, beginning this fall. Other project partners include Enbridge Gas Distribution, Hydro Ottawa and Toronto Hydro, which are providing support. The Gas Technology Institute GTI, a not-for-profit independent technology corporation, was selected to provide the project analytics. The goal of the project is to determine the amount of energy consumption that could be avoided in normal homes.
RetroSAVE, an adaptive product, reduces home energy costs while at the same time enhances overall heating and cooling comfort throughout the home. RetroSave reduces the temperature differential, especially between floors and can help solve seasonal heating and cooling issues by balancing the airflow in a sensible way.
“RetroSAVE is part of a collaborative effort to put conservation first, helping consumers manage their energy bills while delaying the need for new generation and transmission facilities,” said Bob Chiarelli, Ontario's Minister of Energy. RetroSAVE doesn’t require any modifications to the existing forced air ductwork. Through a central smart controller located near the furnace, RetroSAVE receives environmental information from sensors located throughout the home. Automated smart diffusers, placed in the home’s floor registers, balance the amount of airflow in the various areas. RetroSAVE’s sensors currently measure temperature, humidity, light levels and motion.
ASE Smart Energy will be launching the product commercially in early 2015, and selling it via established sales channels that offer professional installation.
Related News

UK's Energy Transition Stalled by Supply Delays
LONDON - The United Kingdom's ambitious plans to transition to clean energy are encountering significant obstacles due to prolonged delays in obtaining essential equipment such as transformers and other electrical components. These supply chain challenges are impeding the nation's progress toward decarbonizing its power sector by 2030.
Supply Chain Challenges
The global surge in demand for renewable energy infrastructure has led to extended lead times for critical components. For example, Statera Energy's storage plant in Thurrock experienced a 16-month delay for transformers from Siemens Energy. Such delays threaten the UK's goal to decarbonize power supplies by 2030.
Economic Implications
These…