No Electricity Means Extra Money For Albertans


Protective Relay Training - Basic

Our customized live online or in‑person group training can be delivered to your staff at your location.

  • Live Online
  • 12 hours Instructor-led
  • Group Training Available
Regular Price:
$699
Coupon Price:
$599
Reserve Your Seat Today

Line Load Shed Service - Imports (LSSi) enhances grid stability by enabling load shedding, frequency support, and import balancing on the BC intertie, allowing AESO to utilize more megawatts while protecting reliability for industrial demand.

 

The Important Points

An AESO demand response where large industrial loads auto-shed to stabilize Alberta's grid after sudden import trips.

  • Triggers when imports exceed 400-500 MW on the BC intertie.
  • Monitors trip loads at 59.5 Hz when frequency sag occurs.
  • Enables 100-200 MW of extra imports during emergencies.

 

Industrial power consumers in Alberta will soon be getting paid to stop using electricity if called on by the provincial grid operator.

 

The notion isn’t as twisted as it seems: the thousands of megawatts continuously cruising the province’s web of transmission lines are kept in near-perfect harmony with demand loads to ensure the grid remains stable during grid alerts across Alberta.

But a lightning strike at the intertie between Alberta and B.C., the province’s main source of imported power, could throw off the balance between supply and demand if industry continues to suck power from the grid.

Hence the new Line Load Shed Service — Imports LSSi announced Wednesday by the Alberta Electric System Operator.

The contracted project ensures six large power consumers in the province will immediately trim back their demand as negawatts in effect if there is a sudden drop in imports, said Kris Aksomitis, AESO manager for demand response.

“This allows us to more fully utilize existing physical infrastructure,” Aksomitis said.

The intertie with B.C. has a capacity of 1,200 megawatts for imports, but currently Alberta is limited importing 600 MW. The program would allow another 100 to 200 MW of power to flow, drawing a parallel to Ontario import expansion efforts in similar circumstances, in case of an emergency, say a lightning strike on the border, he said.

“It balances off that instantaneous shortage by tripping loads, so it rebalances the system near instantaneously,” he said.

The program is triggered when imports exceed 400 to 500 MW, at which point the participants are alerted to switch on specialized monitors, much like how Loblaws powers down during peak events in its stores. If frequency on the grid drops to 59.5 hertz from the normal 60 Hz. the monitors immediately trim power demand.

“It allows us to import more because we can maintain stability after an event due to this service,” Aksomitis said. “Without this service we would have to limit how much we could import on the basis that if that supply disappeared we still have to maintain reliability.”

The AESO selected 432 MW of load capacity for the program from Alberta Newsprint Company Ranger Board, a division of West Fraser Mills EnerNOC Ltd. ERCO Worldwide, A Division of Superior Plus LP Millar Western Forest Products Ltd. and Slave Lake Pulp Partnership.

Contract vary from one to three years. Terms were not released.

Industrial use represents 60 per cent of the power demand in Alberta, different from most other jurisdictions in Canada where residential use drives electricity loads and utilities aim to shave peak demand through conservation.

Related News

Should California classify nuclear power as renewable?

California Nuclear Renewable Bill AB 2898 seeks to add nuclear to the Renewables Portfolio Standard,…
View more

Huge offshore wind turbine that can power 18,000 homes

Siemens Gamesa SG 14-222 DD advances offshore wind with a 14 MW direct-drive turbine, 108…
View more

Greening Ontario's electricity grid would cost $400 billion: report

Ontario Electricity Grid Decarbonization outlines the IESO's net-zero pathway: $400B investment, nuclear expansion, renewables, hydrogen,…
View more

How the 787 uses electricity to maximise efficiency

Boeing 787 More-Electric Architecture replaces pneumatics with bleedless pressurization, VFSG starter-generators, electric brakes, and heated…
View more

Climate change: Electrical industry's 'dirty secret' boosts warming

Sulphur Hexafluoride (SF6) Emissions drive rising greenhouse gas impacts in electrical switchgear, power grids, and…
View more

ERCOT Issues RFP to Procure Capacity to Alleviate Winter Concerns

ERCOT Winter Capacity RFP seeks up to 3,000 MW through generation and demand response to…
View more

Sign Up for Electricity Forum’s Newsletter

Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.

Electricity Today T&D Magazine Subscribe for FREE

Stay informed with the latest T&D policies and technologies.
  • Timely insights from industry experts
  • Practical solutions T&D engineers
  • Free access to every issue

Live Online & In-person Group Training

Advantages To Instructor-Led Training – Instructor-Led Course, Customized Training, Multiple Locations, Economical, CEU Credits, Course Discounts.

Request For Quotation

Whether you would prefer Live Online or In-Person instruction, our electrical training courses can be tailored to meet your company's specific requirements and delivered to your employees in one location or at various locations.