Ontario gets 90 proposals for renewable generation

subscribe

Ninety proposals to generate electricity from renewable sources have been put forward in response to an invitation from the Ontario government.

The proposals total 4,400 megawatts of generating capacity — nearly 15 times the 300 megawatts the province had been seeking, Energy Minister Dwight Duncan told the Legislature.

Renewable sources include wind, the sun, gas from composted plant material or landfills and some kinds of water power.

The companies that want to produce renewable power will now be asked to submit formal bids through a request for proposals process. Final bids must be in by Aug. 25, and the winning proposals will be chosen by the end of the year.

"The interest we've received will help meet or exceed our targets of generating 5 per cent of Ontario's total energy capacity from renewable sources by 2007, and 10 per cent by 2010," Duncan said.

Winning bidders will negotiate 20-year contracts with the soon-to-be-created Ontario Power Authority.

The bid for renewable energy sources is part of a larger campaign by the province to stimulate construction of 2,500 megawatts of conventional generating capacity. Rules for that bidding process are expected to be announced recently.

The Liberal government is scrambling to get more generating capacity built in Ontario because it has promised to shut down all the province's coal-burning power stations by 2007, starting with the Lakeview station next year. The coal plants total about 7,500 megawatts, or 25 per cent of the province's generating capacity.

The province has faced power problems in each of the past two summers — last year with a blackout over much of northeastern North America, and the previous summer when Ontario ran dangerously short of power because of high demand triggered by hot weather.

Dave Butters, president of the Association of Power Producers of Ontario, said the response to the competition for renewable generation shows the interest of the private sector in building new power facilities. Provincially owned Ontario Power Generation was not allowed to bid.

"It's certainly encouraging to see that number of folks who feel they could meet the test," Butters said.

Making 20-year contracts available is also good news for bidders, who prefer longer contracts that provide more certainty, Butters said.

Related News

787 dreamliner

How the 787 uses electricity to maximise efficiency

LONDON - The 787 Dreamliner is different to most commercial aircraft flying the skies today. On the surface it may seem pretty similar to the likes of the 777 and A350, but get under the skin and it’s a whole different aircraft.

When Boeing designed the 787, in order to make it as fuel efficient as possible, it had to completely shake up the way some of the normal aircraft systems operated. Traditionally, systems such as the pressurization, engine start and wing anti-ice were powered by pneumatics. The wheel brakes were powered by the hydraulics. These essential systems required a lot…

READ MORE
fuel-cell-electric-buses-coming-to-mississauga

Fuel Cell Electric Buses Coming to Mississauga

READ MORE

solar and wind power

British Columbia Accelerates Clean Energy Shift

READ MORE

ev charging

Plan to End E-Vehicle Subsidies Sparks Anger in Germany

READ MORE

tesla electricity retailer

Tesla (TSLA) Wants to Become an Electricity Retailer

READ MORE