OPA has a new website
“The original site served us well in the early years of the OPA but it became clear by last year that it did not have the flexibility and clarity of organization that we needed,” reads a press release from the OPA.
The new site uses the original URL, www.powerauthority.on.ca. It contains all material from January 1, 2009.
Older material is fully accessible on an archived site, http://archive.powerauthority.on.ca.
Related News

Huge offshore wind turbine that can power 18,000 homes
BERLIN - Siemens Gamesa Renewable Energy (SGRE) has released details of a 14-megawatt (MW) offshore wind turbine, in the latest example of how technology in the sector is increasing in scale.
With 108-meter-long blades and a rotor diameter of 222 meters, the dimensions of the SG 14-222 DD turbine are significant.
In a statement Tuesday, SGRE said that one turbine would be able to power roughly 18,000 average European households annually, while its capacity can also be boosted to 15 MW if needed. A prototype of the turbine is set to be ready by 2021, and it’s expected to be commercially available…