Electrical Commissioning In Industrial Power Systems
Our customized live online or in‑person group training can be delivered to your staff at your location.
- Live Online
- 12 hours Instructor-led
- Group Training Available
The Joint Operating Agreement (JOA) was executed by both parties in May 2007.
The JOA follows a number of earlier joint operating agreements that PJM has entered with other RTOs. The agreement was developed to improve reliability of the respective transmission systems. The agreement references and confirms a number of earlier PJM/NYISO agreements, procedures, and protocols which remain in effect.
The JOA includes obligations of the parties concerning maintaining interconnected operations, providing emergency assistance, exchanging information, coordinating scheduled outages and transmission planning studies, and coordinating voltage control and reactive power.
The JOA also formalizes the process of electronic checkout of schedules, the exchange of interchange schedules to facilitate Available Transmission Capacity (ATC) calculations, and the standards for interchange revenue metering.
With FERC's approval, the JOA was made effective on its signing date in May 2007. The Coordination Committee will establish a schedule for implementing the features of the agreement.
Related News
Nuclear plants produce over half of Illinois electricity, almost faced retirement
California's solar energy gains go up in wildfire smoke
Tunisia moves ahead with smart electricity grid
Christmas electricity spike equivalent to roasting 1.5 million turkeys: BC Hydro
Quebec shatters record for electricity consumption once again
Tesla (TSLA) Wants to Become an Electricity Retailer
Sign Up for Electricity Forum’s Newsletter
Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.
Electricity Today T&D Magazine Subscribe for FREE
- Timely insights from industry experts
- Practical solutions T&D engineers
- Free access to every issue