Mojave mirrors to provide solar power


Substation Relay Protection Training

Our customized live online or in‑person group training can be delivered to your staff at your location.

  • Live Online
  • 12 hours Instructor-led
  • Group Training Available
Regular Price:
$699
Coupon Price:
$599
Reserve Your Seat Today
Pacific Gas & Electric, the major utility in Northern California, was to announce a commitment to purchase 550 megawatts of solar power to be generated by troughlike arrays of mirrors in the Mojave Desert.

The purchase, one of the largest ever of solar power, will help the utility meet California's aggressive mandate that utilities have enough renewable sources online or under contract by 2010 to supply one-fifth of the electricity they sell. The new solar plant is expected to begin producing energy in 2011 or 2012.

The contract, along with similar ones recently signed by Southern California Edison, represents the resurrection of thermal solar arrays, a technology first deployed in the 1980s that foundered in the 1990s because of a collapse in natural gas prices.

But with the price picture shifting and state mandates for renewable energy spreading, an Israeli company, Solel Solar Systems of Beit Shemesh, is betting that this technology will pay off. The approach may lack the appeal of the more familiar rooftop photovoltaic cells, but it costs only around half as much for each unit of energy produced.

PG&E executives said Tuesday that during peak summer hours, power from the 9 square miles, or 23.4 square kilometers, of mirrors in the Mojave Solar Park Project would provide electricity to hundreds of thousands of homes.

"We view concentrated solar as one of the most promising technologies for us," Fong Wan, vice president for energy procurement, said in an interview.

While PG&E executives and the president of Solel, Avi Brenmiller, would not specify how much the utility will pay, people close to both companies put it at slightly more than 10 cents a kilowatt-hour - roughly the retail price for an average kilowatt-hour for American residential customers.

Electricity will be produced using 6-foot, or 1.8-meter, trough-shaped mirrors that focus rays of the desert sun on a pipe less than 3 inches, or 7 centimeters in diameter, heating a fluid inside to 750 degrees Fahrenheit (399 Celsius); the fluid will make steam to drive a turbine. Small motors will tilt the mirrors to keep them facing the sun.

The solar facility, to be built between the Nevada state line and Barstow, California, will consist of four modules of 140 megawatts each, Brenmiller said. "It's going to be similar to existing plants in style," he said, but added, "It will be a little larger than the largest one ever built."

A Spanish company, Acciona Energy, recently opened a similar but smaller facility near Boulder City, Nevada, a 64-megawatt plant called Nevada Solar One.

According to Wan, about 12 percent of Pacific Gas & Electric's electricity comes from renewable sources, divided somewhat evenly among wind, biomass, small hydropower and geothermal. (California does not count traditional large hydroelectric dams toward the quota.)

The contract with Solel would add nearly two percentage points to the company's renewable energy total.

By contrast, Southern California Edison's renewable portfolio now accounts for about 17 percent of its power.

Both Southern California Edison and San Diego Gas & Electric have signed contracts with a different solar thermal company, Stirling Energy Systems of Phoenix, Arizona, for many hundreds of megawatts of power.

Wan said that PG&E was negotiating other purchases from solar thermal developers. Ideally, he said, solar thermal energy would eventually account for up to 5 percent of the utility's energy supply. The company is on track to meet the 20 percent quota, he said, even if some suppliers do not deliver as promised.

Related News

FPL Proposes Significant Rate Hikes Over Four Years

FPL Rate Increase Proposal 2026-2029 outlines $9B base-rate hikes as Florida grows, citing residential demand,…
View more

Here's what we know about the mistaken Pickering nuclear alert one week later

Pickering Nuclear Alert Error prompts Ontario investigation into the Alert Ready emergency alert system, Pelmorex…
View more

Germany is first major economy to phase out coal and nuclear

Germany Coal Phase-Out 2038 advances the energy transition, curbing lignite emissions while scaling renewable energy,…
View more

Energy Department Announces 20 New Competitors for the American-Made Solar Prize

American-Made Solar Prize Round 3 accelerates DOE-backed solar innovation, empowering entrepreneurs and domestic manufacturing with…
View more

Ex-SpaceX engineers in race to build first commercial electric speedboat

Arc One Electric Speedboat delivers zero-emission performance, quiet operation, and reduced maintenance, leveraging battery propulsion,…
View more

Old meters giving away free electricity to thousands of N.B. households

NB Power Smart Meters will replace aging analog meters, boosting billing accuracy, reducing leakage, and…
View more

Sign Up for Electricity Forum’s Newsletter

Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.

Electricity Today T&D Magazine Subscribe for FREE

Stay informed with the latest T&D policies and technologies.
  • Timely insights from industry experts
  • Practical solutions T&D engineers
  • Free access to every issue

Download the 2026 Electrical Training Catalog

Explore 50+ live, expert-led electrical training courses –

  • Interactive
  • Flexible
  • CEU-cerified